China: a narrowband backbone, broadband by region, and a new resilience mandate
No single national public safety broadband network. PDT narrowband carries police and emergency command; the 2026–2030 emergency plan now requires communications that survive the "three-break" scenario.
Share ↓
Last updated 8 November 2026 · Status: Piloting · Model: policy-led, regional
| National PS broadband network | None announced |
| Narrowband standard | PDT (Police Digital Trunking), Chinese standard |
| Broadband trunking spectrum | 1447–1467 MHz (TDD), set aside in 2015 |
| Broadband trunking standard | B-TrunC (CCSA), ITU-R recommended for PPDR in 2014 |
| Policy anchor | State Council Document No. 15 (2026), the 2026–2030 emergency system plan |
| Main vendors | Hytera, Caltta (ZTE), Kirisun, Huawei, CICT Mobile, China Tower |
How the system is built
China's public safety communications rest on narrowband digital trunking. Police use PDT, a domestic standard. Emergency management authorities have built 370 MHz PDT command networks, combining fixed and mobile base stations with push-to-talk over the public cellular network (CNKI/NAPSTIC paper, 2024). In 2019 the Ministry of Industry and Information Technology (MIIT) also opened the 800 MHz trunking band (806–821/851–866 MHz) to PDT systems (MIIT notice, 2019).
For broadband, MIIT set aside 1447–1467 MHz in 2015 for broadband digital trunking private networks serving government, public safety and emergency communications (MIIT notice No. 59, 2015). These networks use B-TrunC, an LTE-based trunking standard from the China Communications Standards Association that ITU-R recommended as a PPDR broadband trunking standard in November 2014 (CCR). Deployments are city and provincial projects rather than one national network.
The policy shift
The State Council's plan for the 2026–2030 period, dated 30 May 2026, asks for stronger fallback emergency communications and faster repair, so that communications stay up when roads, networks and power all fail, the "three-break" scenario (MEE copy of Document No. 15). Our analysis: Built for the three-break scenario.
The mandate is already shaping procurement and drills. At the national "Emergency Mission 2026" flood exercise in Hubei on 17 June 2026, vendors showed self-powered base stations and terminals that combine 370 MHz PDT, public-network PTT and BeiDou short messaging (C114). China Tower, CICT Mobile and China Unicom Shandong have tested an air-space-ground system for the same scenario (C114).
In standards
Chinese companies are moving from following to shaping mission-critical standards: a joint 6G MCX proposal was accepted at 3GPP SA1 in 2025. See From Follower to Shaper.
What to watch
- Provincial plans that turn Document No. 15 into budgets for resilient base stations, satellite backhaul and fused terminals.
- Whether 1.4 GHz broadband trunking expands beyond city projects, or public-network slicing takes its place.
- Export: PDT and B-TrunC systems are increasingly offered abroad by Chinese vendors.
Part of Asia Watch, our market-by-market tracker of public safety broadband in Asia-Pacific. Spotted something out of date? Write to hello@criticalcomms.asia.